Solar, Batteries & Off-Grid Power

Light, comms, water, cold food and heat: keeping the essentials running when the grid goes down.

⏱️
Read this first: the three things most people get wrong

1. Standard rooftop solar switches OFF in a power cut. Grid-tied inverters must shut down when the grid fails (anti-islanding), so they don't electrocute line workers. For power during a blackout you need a battery with backup/EPS, a separate off-grid system, or a portable power station. 2. UK winter sun is weak. A panel gives roughly a sixth to a tenth of its June output in December. Size for winter, or accept a generator as the winter top-up. 3. Batteries and DC wiring start fires. Every positive cable must be fused, batteries go outside living spaces, and anything connected to your house wiring is a job for a registered electrician. This is general guidance, not electrical or legal advice. UK electrical work must meet BS 7671.

1. How Much Power Do You Actually Need?

Start with a load audit, not a shopping list. In a crisis you run essentials only.

LoadTypical drawHours/dayWh/day
LED lighting (4 bulbs)4 Γ— 7 W5140
Phones (Γ—3) + radioβ€”β€”60
Wi-Fi router + laptop10 W + 45 W6330
Fridge-freezer (A-rated)80–150 W cycling24600–1,000
Chest freezer (alone)60–100 W cycling24400–700
Gas boiler (controls + pump)80–150 W6 (winter)500–900
Water pump (well/borehole)500–1,000 W0.5250–500
CPAP (no humidifier)30–60 W8240–480
Electric kettle2,000–3,000 W0.2400–600 ⚠️
Microwave1,000–1,500 W0.2200–300
Electric heater / oven / immersion2,000–3,000 Wβ€”βœ— Not realistic off batteries
πŸ’‘
The prepper's power budget
  • Survival (lights, comms, phones): ~200–300 Wh/day. One portable power station handles this.
  • Comfortable (+ fridge-freezer, router, laptop): ~1–1.5 kWh/day.
  • Functional home (+ boiler, pump, some cooking): ~3–5 kWh/day.

Cook and heat with gas, wood or a stove, not electricity. Heat is the energy hog.

⚠️
Your gas boiler won't run in a power cut

Modern boilers need electricity for the controls, fan and pump. Ask an electrician to change the boiler's fused spur to a plug and socket, so you can run it from a power station or inverter during an outage (β‰ˆ100–150 W).

2. Five Ways to Get Power When the Grid Is Down

OptionCostWorks in a power cut?SkillBest for
A. Portable power station + folding panelsΒ£300–2,000βœ… YesNoneEveryone. Start here.
B. Plug-in (balcony) solar ≀ 800 WΒ£300–800❌ Not on its own (shuts off)NoneCutting bills; renters
C. Rooftop grid-tied solar + battery with backup (EPS)Β£6,000–15,000βœ… If it has backup/EPS or a whole-home gatewayInstallerHomeowners: long-term savings + resilience
D. Stand-alone off-grid system (shed/bunker/cabin)Β£1,500–8,000 DIYβœ… Yes: fully independentDIY with carePreppers who want full independence
E. GeneratorΒ£500–3,000βœ… Yes, while fuel lastsElectrician for hook-upWinter top-up; big loads

The resilient answer is usually a layered mix: A (immediate) + C or D (daily) + E (winter backup) + small batteries (lights and radios).

3. UK Sun: Sizing for Winter

Approximate daily output per 1 kWp of panels (south-facing, ~35Β°)

MonthSouth EnglandMidlands / WalesScotland
Dec0.5–0.7 kWh0.4–0.60.2–0.4
Feb / Oct1.5–2.01.3–1.81.0–1.5
Apr / Aug3.5–4.03.2–3.83.0–3.5
Jun4.0–4.83.8–4.53.6–4.3
Year~950–1,050 kWh~850–950~750–900

These are rough planning figures; overcast weeks give far less. Check your postcode for free with the EU PVGIS tool and use its December figure.

The sizing formula

  1. Daily need (Wh) from your load audit, e.g. 1,200 Wh.
  2. Battery (Wh) = daily need Γ— days of autonomy Γ· usable depth of discharge Γ· inverter efficiency. e.g. 1,200 Γ— 3 days Γ· 0.9 (LiFePO4) Γ· 0.9 = ~4,400 Wh (β‰ˆ 5 kWh)
  3. Panels (W) = daily need Γ· (winter kWh per kWp) Γ— 1.25 losses. e.g. 1,200 Γ· 0.6 Γ— 1.25 β‰ˆ 2,500 W of panels to fully cover December in the south. Summer the same need takes ~400 W, which is why most UK systems pair ~1–2 kWp of panels with a generator for the darkest 8–10 weeks.
πŸ’‘
Winter tricks

Steepen panels to 55–60Β° for winter (they shed snow and catch low sun). Keep them clean. Make sure nothing shades them between 10 am and 2 pm in December (the sun is only ~15Β° high at noon). Cut usage hard in Nov–Jan.

Seasonal tilt on an adjustable ground mount, shown in profile for London.
June
December
Drag to compare: the June sun at ~62Β° vs the December sun at ~15Β°.

4. The Rules (2026)

TopicWhat applies
Planning: roof panels (England)Usually permitted development: panels mustn't sit above the highest part of the roof (excluding the chimney) and mustn't project more than 200 mm from the slope. The rules were widened on 27 Aug 2026 (more locations, flat roofs, plug-in solar). Projects that no longer qualify can use the old rules until 26 Aug 2027. Listed buildings, conservation areas, Scotland, Wales and NI differ: check with your council.
Plug-in solarLegal across GB from 27 Aug 2026 for compliant kits up to 800 W, plugged into a standard socket. It must meet the UK product specification. Not on wooden structures or cladding.
Building Regs: electrical (England & Wales)Connecting to your house wiring (new circuits, consumer-unit work, inverters, batteries) is notifiable under Part P. Use a registered electrician, or notify Building Control before you start. Scotland uses its own Building Regulations.
Grid connectionG98: small inverters (≀16 A per phase, i.e. ~3.68 kW single-phase): install, then notify the DNO within 28 days. G99: bigger systems need DNO approval before switching on.
Export payments (SEG)Need an MCS-certified installation and the DNO notification. A DIY system can be legal but won't earn export payments.
Battery fire safetyPAS 63100:2024 sets out how home batteries should be installed. Prefer a location outside living space (garage, outbuilding, external enclosure) and never in an escape route. Fit warning labels at the consumer unit.
Working at heightRoofs kill DIYers every year. Scaffold with edge protection, not ladders, for roof work.
Insurance & mortgageTell your insurer. DIY roof installs can affect cover.

5. Retrofitting Panels on Your Roof

Cutaway of a tiled roof showing roof hooks fixed to rafters, rails, clamps and a fitted solar panel
Hooks are screwed into rafters under the tiles; rails sit on the hooks; clamps hold the panels to the rails.
Step by step: lift the tile, fix the hook to the rafter, refit the tile, fit the rails, then the panel and clamps.
βš–οΈ
DIY or installer?

For a grid-connected rooftop system, we strongly recommend an MCS installer. You get scaffolding, insurance, a Part P sign-off, the DNO notification and SEG eligibility. Many preppers have the installer fit a hybrid inverter with backup/EPS and battery-ready wiring, then add their own off-grid kit separately. The steps below explain the job so you can specify it, check it, or do it on an outbuilding.

Step 1: Survey

Step 2: Equipment

ItemNotes
Panels400–450 W mono PERC/TOPCon, ~1.7 Γ— 1.1 m, ~20–22 kg
Roof hooksMatched to your tile type (adjustable height), stainless steel, 2 per rail per ~1.2 m
RailsAluminium, with splice kits
ClampsEnd clamps and mid clamps sized to the panel frame depth
Coach screwsStainless steel, β‰₯ 6 Γ— 100 mm, β‰₯ 60 mm into the rafter
DC solar cable4 or 6 mmΒ² UV-rated, double-insulated (red/black)
MC4 connectorsGenuine, same brand on both halves, crimped with the correct tool
DC isolatorDC-rated, near the inverter (many inverters have one built in)
InverterHybrid inverter (battery + backup/EPS) if you want blackout power
AC isolator, cable, MCB/RCBOElectrician
ToolsScaffold, angle grinder (to notch tiles), drill/impact driver, MC4 crimper and spanners, multimeter rated β‰₯ 1,000 V DC, torque wrench, cable glands, flashing (for slates)

Step 3: Mounting

  1. Scaffold with edge protection.
  2. Mark the rafters (lift tiles to find them; they're usually at 400 or 600 mm centres).
  3. Lift tiles at each hook position. Fix the hook to the rafter (never just to a batten) with stainless coach screws. Pack it so the hook arm sits clear of the tile below.
  4. Notch the underside of the tile with a grinder so it sits flat over the hook arm. A rocking tile lets water in.
  5. Fit the rails to the hooks. Use a string line to get them straight and parallel, with spacing per the panel's clamping zones (usually ~ΒΌ of panel length from each end).
  6. Run the cables before the panels go on: clip MC4 leads to the rails (never lying on tiles), and take the DC cables into the loft through a sealed tile vent or gland.
  7. Fit the panels: end clamps at each end, mid clamps between panels. Torque to spec.

Step 4: Wiring the strings

☠️
Panels are live whenever there's daylight

A string can sit at 300–600 V DC, and DC arcs don't self-extinguish like AC. Never unplug an MC4 under load. Switch the DC isolator off first. To work on panels in daylight, cover them with an opaque sheet.

Step 5: Commission & paperwork

Insulation resistance and polarity tests, an Electrical Installation Certificate, Part P notification, G98/G99 to the DNO, an MCS certificate (if using an installer), labels at the meter/consumer unit, and keep the warranty paperwork in your grab-file.

6. Second-Hand Panels & Re-Fitting Old Ones

Panels lose only ~0.5% output per year, so used panels from re-roofs and upgrades are a cheap prepper resource (often Β£20–60 each).

Inspect before you buy:

Re-fitting panels (roof repair, house move, moving them to a bunker):

  1. Cover the panels or work at dawn/dusk; switch the inverter and DC isolators off.
  2. Unclip the MC4s with the release tool and cap them.
  3. Remove the clamps, then the panels (two people). Store them on edge, glass-to-glass with cardboard between, never flat with weight on top.
  4. Inspect the hooks and rails; replace any corroded screws. Re-flash or re-notch tiles as needed.
  5. Re-fit, re-test polarity and Voc, then re-commission. A grid-tied system needs the electrician/installer to re-certify.

7. Ground-Mount & Shed/Bunker Off-Grid Build

Ground-mounted solar array on an aluminium frame with ground screws, cable trench to a shed
A ground mount is easy to build and clean, and you can steepen it for winter.

Frame

The off-grid system board

Off-grid system board: PV isolator, MPPT, class-T fuse, busbars and shunt, LiFePO4 bank, inverter, AC board
Power flows left to right. Every positive conductor leaving the battery is fused.
Energy flow in an off-grid system: panels charge the battery by day; the inverter draws from the battery to power your AC circuits.
#ComponentChoose
1PV DC isolatorDC-rated for string voltage
2MPPT charge controllerMax PV voltage > cold Voc; charge current β‰ˆ battery capacity Γ· 5 (e.g. 100 Ah 48 V β†’ 20 A+)
3Main battery fuseClass-T or MRBF fuse within 30 cm of the battery positive, rated for the battery's short-circuit current
4Busbars + shuntCopper busbars; a shunt-based battery monitor (state of charge)
5Battery bankLiFePO4 with a built-in BMS, 12/24/48 V (see Β§8)
6Inverter/chargerPure sine wave. Continuous rating β‰₯ your largest load; surge β‰₯ 2–3Γ— for motors and fridges. Inverter/chargers can also charge from a generator.
7AC distributionSmall consumer unit with RCD/RCBOs, earthing arrangement designed by an electrician
β€”Smoke/heat alarm, fire extinguisher (rated for electrical fires), warning labelsStrongly recommended; PAS 63100 covers labelling and fire safety

Choose your voltage

SystemUp to ~Why
12 V1 kW inverterVans, small sheds, simple 12 V lights/fridges
24 V2–3 kWMedium cabins
48 V3–10 kWBest for home/bunker: a quarter of the current of 12 V, so thinner cables and less heat

Cable sizing (keep voltage drop < 3%)

Thick, short battery cables are essential: a 3 kW inverter on 12 V pulls ~250 A, but on 48 V only ~65 A. Use proper fine-strand battery cable, hydraulic-crimped lugs, heat-shrink, and torque every terminal. Loose lugs are the #1 cause of DIY battery fires.

8. Battery Banks: Chemistry, Sizing, Safety

ChemistryUsable depthCycles (to 80%)ColdSafetyVerdict
LiFePO4 (LFP)90–100%3,000–6,000+Must not charge below 0 Β°C (unless self-heating)Most stable lithium typeβœ… Best choice for homes and preppers
NMC lithium80–90%1,000–2,000SimilarHigher thermal-runaway riskOlder power stations and EVs; avoid for fixed banks
AGM / gel lead-acid50%400–1,000Tolerates coldLow fire risk; heavyCheap backup; short life if deeply cycled
Flooded lead-acid50%1,000–1,500Tolerates coldHydrogen gas: ventilateOld-school off-grid; needs watering
Sodium-ion90–100%3,000+Good in coldVery stableEmerging; promising for unheated sheds

Safety rules

  1. Location: outside living space where you can (garage, outbuilding, external cabinet); never in a loft, under the stairs, in a hallway or an escape route. Keep it off combustible surfaces.
  2. Temperature: 5–30 Β°C ideal. LiFePO4 in an unheated shed needs self-heating batteries or an insulated box.
  3. BMS: every lithium battery must have a battery management system (cell balancing, over/under-voltage, temperature cut-off).
  4. Fuse every positive conductor, as close to the battery as possible.
  5. Detection: a heat alarm (or smoke alarm) above the battery; a CO2 or dry-powder extinguisher nearby. A lithium battery fire can't really be extinguished: get out and call 999.
  6. Mixing: never mix old and new batteries, or different chemistries or brands, in one bank.

Storage for preppers

9. Plug-In Solar & Portable Power Stations

Portable power station with folding solar panels, coolbox and lantern
The fastest route to blackout resilience: no installation, ready on day one.

Portable power stations

Plug-in ("balcony") solar

Two wall-mounted panels with a micro-inverter plugged into an outdoor socket
Plug-in solar went legal on 27 August 2026. It cuts bills, but it is not backup power on its own.

10. Small-Battery Prepping

Small-battery blackout kit: NiMH AAs, charger, 18650s, power banks, coin cells, lithium primaries, headtorch, lantern, USB panel, radio
Standardise: everything runs on AA or USB-C, and everything can be recharged from the sun.
BatteryUseShelf lifePrep tip
LSD NiMH AA/AAA (Eneloop-type)Torches, radios, remotes, game camerasHold ~70–85% after a year in storageYour daily-use workhorse. Buy 16–24 AA + 8 AAA and a USB smart charger.
Lithium primary AA/AAA (non-rechargeable)Long-term storage, smoke alarms, cold weather10–20 years, works to βˆ’40 Β°CYour "sealed cache" battery
Alkaline AA/AAACheap backup5–10 yearsCan leak: never store them inside devices
18650 / 21700 Li-ion (protected, flat- or button-top)High-output torches, power banksStore at ~50%Buy from reputable brands only. Fakes are fire risks.
CR2032 / CR123AScopes, meters, alarms, key fobs10 yearsKeep a few spares of every size your kit uses
USB-C power banks (10–20,000 mAh)Phones, headtorches, radiosRecharge every 3–6 monthsOne per person
12 V leisure batteryCar/van fridge, LED stripsLead-acid: keep it chargedWorks with a 12 V fridge and a cigarette-socket inverter

The kit:

  • Headtorch per person + 1 lantern per room
  • 24 Γ— NiMH AA, 8 Γ— AAA + USB charger
  • 12–24 lithium AA (sealed cache)
  • 2–3 USB-C power banks
  • 21–40 W folding USB solar panel
  • Wind-up/solar/battery radio (FM/LW for BBC Radio 4 emergency broadcasts)
  • Spare coin cells for every device you own
  • Rotate: mark the purchase date on every pack. Test and top up at each clock change (March and October).

11. Generators: The Safe Way

Generator on a slab away from the house, cable to a wall inlet, metal fuel cans
An inlet and changeover switch fitted by an electrician, with the generator well away from the doors and windows.
TypeProsCons
Inverter generator (1–3 kW)Quiet, clean power safe for electronics, efficientSmaller output
Open-frame (3–8 kW)Runs big loadsNoisy; "dirty" power; thirsty
Dual-fuel (petrol + LPG)LPG stores indefinitely; cleaner~10% less power on LPG
DieselLong engine life; diesel stores wellExpensive, heavy, noisy

Non-negotiable safety

Run-time maths

A 2 kW inverter generator at half load uses ~0.5–0.7 L/hour. Run it 2–3 hours a day to recharge your battery bank through the inverter/charger, then switch off. That stretches 30 L to around 2–3 weeks.

12. Blackout Power Plan

PhaseActions
0–2 hoursHeadtorches on. Check neighbours/the DNO (call 105) to see whether it's local or widespread. Close freezer lids (a full freezer stays frozen ~24–48 h). Switch UPS/power station loads to essentials.
2–24 hoursPower station runs router/phones/lights. Boiler plugged into the power station if it's cold. Charge everything while you have solar. Fill water containers in case pumps fail.
1–3 daysGenerator 2–3 h/day to recharge the battery bank and cycle the freezers. Cook on gas/wood. Battery-radio updates.
3+ daysRation to the survival budget (~300 Wh/day). Eat freezer contents first, then preserve (see Butchery). Protect fuel.

Priority order for limited power: 1. medical devices β†’ 2. communications (phone, radio) β†’ 3. lighting β†’ 4. water pump β†’ 5. heating controls β†’ 6. food cold-chain β†’ 7. everything else.

13. Collapse Collapse Protocol: Power After the Grid

πŸ”΄
COLLAPSE PROTOCOL: long-term grid-down planning.

Some of these steps (disconnecting from the grid, unnotified wiring, re-purposing equipment) bypass normal rules. They are listed for a scenario in which the grid, electricians and regulators are gone for months. Today, use a registered electrician.

14. Kit Tiers

Tier 0: Blackout basics (Β£50–200 Β· everyone)

  • Headtorch per person, 2 LED lanterns
  • 24 Γ— NiMH AA + USB charger; 12 lithium AA (sealed)
  • 2 Γ— 20,000 mAh power banks
  • Wind-up/solar radio
  • CO alarm + smoke alarms with lithium batteries
  • Printed blackout plan; DNO number 105 saved and written down

Tier 1: Portable resilience (Β£400–2,000 Β· beginner)

  • 1–2 kWh LiFePO4 power station with UPS function
  • 200–400 W folding solar panels
  • Electrician converts the boiler spur to a plug
  • 12 V coolbox/fridge; 21–40 W USB panel
  • Optional: 800 W plug-in solar kit (choose one with an off-grid outlet)

Tier 2: Off-grid circuit (Β£2,000–8,000 Β· competent DIY + electrician sign-off)

  • 1–3 kWp ground-mount or shed-roof array
  • 48 V LiFePO4 bank 5–10 kWh, MPPT, 3–5 kW inverter/charger, class-T fuse, shunt, busbars
  • 2–3 kW inverter generator (dual-fuel) + inlet and changeover switch
  • 30 L petrol in metal cans with stabiliser + LPG cylinders
  • Battery cabinet with heat alarm; extinguisher
  • Skills: load audit, multimeter use, crimping, reading a battery monitor

Tier 3: Whole-home resilience (Β£8,000–25,000 Β· installer)

  • 4–6 kWp roof array (MCS) + hybrid inverter with whole-home backup
  • 10–20 kWh battery, installed to PAS 63100 in a garage or external enclosure
  • Ground-mount winter array (steep tilt) on its own MPPT
  • Larger dual-fuel or diesel generator with automatic changeover
  • Separate off-grid circuit for essentials: fridge, boiler, pump, comms
  • Well/borehole pump on the backed-up circuit

Tier 4: Bunker / homestead (Β£25,000+)

  • Two independent systems (house + bunker/outbuilding) so one fault isn't total failure
  • Micro-hydro or wind for winter generation
  • Spares cache in steel boxes: MPPT, inverter, BMS, panels, cable, connectors, fuses, crimpers, meters
  • 12 months of rotated generator fuel within legal limits (prefer LPG/diesel)
  • Printed wiring diagrams, manuals and settings for every device

Related Sections: Food & Water β†’ Smallholding Livestock β†’ Butchery & Game Processing β†’ UK Survival Hunting & Trapping